新2会员网址(www.hg108.vip)实时更新发布最新最快最有效的新2网址和新2最新网址,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。
KUALA LUMPUR: Boustead Heavy Industries Corporation Bhd's (BHIC) indirect subsidiary, Boustead DCNS Naval Corporation Sdn Bhd (BDNC), has accepted another nine-month extension for a Ministry of Defence Malaysia (MINDEF) contract worth RM79.32 million.
In a filing with Bursa Malaysia today, BHIC said the extension is from Jan 1, 2022 to Sept 30, 2022.
BDNC had previously accepted a contract to provide in-service support for Prime Minister’s class submarines for the Royal Malaysian Navy.
,,新2手机网址(www.zq38.vip)实时更新发布最新最快的新2手机网址、新2手机网址线路、新2手机网址登录网址、新2手机网址管理端、新2手机网址手机版登录网址、新2手机皇冠登录网址。
"Apart from the extension of the contract period and a revision of the contract value, there are no significant differences between the substance of the contract and this extension. The additional contract extension will contribute positively to the earnings of BHIC group for the financial year ending Dec 31, 2022," the filing said.
BDNC is a joint venture company between BHIC Defence Technologies Sdn Bhd (60 per cent), a wholly owned subsidiary of BHIC, and Naval Group (40 per cent), the filing said. - Bernama
转载说明:本文转载自Sunbet。 环球UG声明:该文看法仅代表作者自己,与本平台无关。转载请注明:新2手机网址:BHIC unit accepts Mindef's 9-month contract extension for RM79.32mil
Zarul Ahmad Mohd Zulkifli, 62, said sometime in 2015, he brought RM100,000 cash in a white envelope and a black-coloured watch to Lim’s office on the 28th floor of Komtar, George Town, when the latter was Penang chief minister.大家看看我!求带
A Reuters poll published on Monday showed more than 70% of 65 economists expected a half-point increase.下次早点来